Owning or renting a unit in Adelaide changes the bill-saving conversation quite a bit compared with a standalone house. You generally can't add rooftop solar, you can't reconfigure ductwork through a neighbour's ceiling space, and any change that touches the building's exterior or shared systems usually needs sign-off from a body corporate before it goes ahead. That's a genuinely different starting point — but it doesn't mean you're stuck watching your bill with no options.
As a licensed electrical contractor (BLD 274739 · PGE 265145 · AU 61210) that regularly works inside strata and community title buildings across Adelaide, we see the same handful of things make a real difference for unit owners — and just as often see people either assume they need approval for something minor, or skip approval for something that genuinely needed it. Here's a practical list to work through.
What actually moves the needle in a shared building
1. Work out what you can and can't control first
Before spending money on anything, separate your unit's electrical setup into what's genuinely yours to change (your own split system, your own power points and lighting, anything inside your meter) versus what's shared infrastructure you'd need approval to touch (the switchboard's common sections, risers, exterior wall penetrations, and anything visible from outside the building). Most of the useful bill-saving moves for a unit live in the first category.
2. Check how your unit is actually metered
Some older strata buildings run on an embedded electricity network, where the body corporate holds the bulk account and on-sells power to individual units, sometimes at a different rate structure to a standard retail plan. Check a recent bill for signs of this — if you can't switch retailers freely, you're likely on an embedded network, and that changes which bill-saving levers are even available to you.
3. Ask body corporate for their air conditioning and electrical guidelines directly
Rather than guessing what's allowed, ask your body corporate manager or committee for their actual written position on split system installation and electrical work before you buy anything. Under South Australia's Strata Titles Act 1998, work affecting common property or the building's external appearance generally needs approval, and outdoor condenser units almost always fall into that category since they're fixed to an external wall or balcony.
4. Get approval before you purchase, not after
A rejected application after you've already bought a system is a genuinely avoidable cost. Submit your proposed unit location, condenser placement, and installer details for approval first — our guide on air conditioning and electrical for strata units walks through exactly what a typical application needs to include.
5. Size and service your split system properly for a small footprint
In a smaller unit, an oversized or poorly maintained split system wastes proportionally more of your bill than the same problem would in a larger house, simply because the fixed running cost is a bigger share of a smaller space's total energy use. A correctly sized system and a clean filter make a genuinely bigger relative difference here — our air conditioning maintenance team can check both when servicing your unit.
Not sure whether your unit's split system is the right size, or whether an upgrade needs body corporate approval first?
Book an Obligation-Free Assessment6. Control heat load with what's inside your own unit
You can't change the building's insulation or orientation, but block-out curtains, door draught seals, and closing off unused rooms are all fully within a tenant's or owner's control and reduce how hard your split system has to work, regardless of what the building itself is doing.
7. Use your own unit's off-peak scheduling even if shared systems can't be changed
Running your split system, dishwasher, or washing machine during South Australia's solar sponge window — the middle of the day when network pricing is typically lowest — is a decision you can make entirely within your own unit, independent of anything shared with the rest of the building.
8. Read your own bill closely, not just the body corporate levy
Your body corporate fees cover shared costs like common area lighting and lift power, which are separate from your individual unit's electricity bill. Don't let a rising strata levy distract from checking your own usage bill for the actual drivers of your personal power costs.
9. If structural change isn't possible, focus on what an upgrade inside your unit can still deliver
Where body corporate rules genuinely rule out bigger changes, smaller electrical upgrades confined to your own unit — better circuit protection, an efficient appliance circuit, or LED lighting throughout — are usually still available without needing scheme-wide approval, since they don't touch common property. Our electrical upgrades team can assess what's realistically achievable inside your own meter before you raise anything with the committee.
10. Use a licensed installer so any approval conditions are actually met
Body corporate approvals commonly come with conditions — condenser placement, noise limits, or matching the building's external finishes. A licensed, experienced installer knows to build those conditions into the job rather than leaving you to explain a non-compliant installation after the fact, which is a common cause of disputes we're called in to resolve.
11. Raise shared-infrastructure ideas at the AGM rather than waiting for someone else to
Bigger, building-wide changes — solar on shared roof space, EV charging bays, or upgraded common-area lighting — do sometimes go ahead, but only when an owner actually puts the proposal forward at an annual general meeting with enough detail (indicative cost, an installer, and a maintenance plan) for the committee to vote on. If you'd like that detail prepared properly before you raise it, that's exactly the kind of scoping work we help apartment owners with.
We regularly work with unit and apartment owners across Kent Town and Hackney navigating exactly this balance between what a body corporate controls and what's genuinely up to the individual owner — if you're renting rather than owning, our guide on energy-saving tips for renters covers the tenant-specific side of this same question, and our piece on electrical upgrade restrictions in apartments and units goes deeper on what needs approval versus what doesn't. For a broader household checklist beyond apartment-specific issues, see our 15 ways to lower your power bill.
Frequently Asked Questions
Do I need body corporate approval to install a split system in my unit?
In most South Australian strata and community title schemes, yes — installing an outdoor unit or running new wiring typically affects common property or the building's external appearance, which under the Strata Titles Act 1998 generally needs body corporate approval before work begins, even if your by-laws are silent on air conditioning specifically.
Why is my apartment's power bill high when I can't control the building's heating or cooling?
Even with no control over shared infrastructure, your own unit's power bill is still driven by what happens inside it — your split system's efficiency and servicing, how well the unit retains heat or cool air, and your own appliance and standby usage all remain fully within your control regardless of what's shared.
Can I upgrade my apartment's electrical circuits without approval?
Work confined entirely inside your own unit's meter and wiring — such as adding a dedicated circuit for an appliance — is usually your own responsibility rather than the body corporate's, but any work touching the switchboard, common property risers, or the building's shared metering should still be checked against your scheme's by-laws first.
Want your unit's split system running at its best?
We service and install air conditioning across Adelaide's strata and community title buildings, with body corporate approvals handled properly from the start.
Sources referenced include South Australia's Strata Titles Act 1998 and general strata industry guidance on body corporate approval for air conditioning and electrical work. This article is general information only — always check your own scheme's by-laws, which can be stricter than the general legislation.
Disclaimer: This article is provided as general information and guidance only. It draws on publicly available sources, government and industry publications (referenced where relevant), and Voltas Electrical Adelaide's own trade experience — it is not personalised advice for your specific property and does not replace a licensed, on-site assessment. Regulations, pricing, and product or brand details can change over time, so please independently verify anything relevant to your decision and seek your own professional advice before acting. To the fullest extent permitted by law, Voltas Electrical Adelaide accepts no responsibility or liability for any loss, damage, or other outcome arising from reliance on the information in this article. Where this article refers to a same-day or obligation-free quote or assessment, that refers to the quote or assessment itself — a site visit to a property well outside our normal Adelaide metro service area may incur a travel or call-out fee, as set out in our Terms & Conditions, which also has full details on the points above.






























