Call Now: 1800 865 827 Get a Quote
Electrical Upgrades · Adelaide, SA

Charging Two Electric Vehicles at Home in Adelaide: What It Takes Electrically

Two EVs in the driveway is increasingly common across Adelaide's eastern and inner suburbs — but plugging in two chargers doesn't automatically mean your switchboard can feed both at once.

Quick Answer

Most single-phase Adelaide homes cannot run two Level 2 EV chargers at full 32A power simultaneously without exceeding the main switch rating. A load-sharing device, a lower shared current cap, sequential/scheduled charging, or — for genuine simultaneous full-speed charging every night — a three-phase supply upgrade are the four practical solutions.

Two-EV households are no longer rare in suburbs like Kensington Park and Tusmore, where driveways increasingly hold a family car and a second vehicle side by side. It's a genuinely different electrical planning problem to a single EV charger installation, because the question shifts from "can my switchboard fit one more circuit" to "can my supply feed two large loads at the same time, every night, without nuisance tripping or exceeding my network connection agreement." The answer is almost always yes — but how you get there depends on your existing switchboard capacity, your electricity plan, and how badly you actually need both cars charged simultaneously versus charged by morning.

Voltas Electrical & Airconditioning (BLD 274739 · PGE 265145 · AU 61210) assesses two-EV household wiring the same way we assess any load-heavy property — by measuring actual available capacity against every circuit already on the board, not just assuming there's room. Our electrical upgrades and electrical installation teams handle this as a standard part of second-charger quoting across Adelaide metro.

Why Two Chargers Is a Different Problem to One

A single 7kW (32A) home EV charger fits comfortably on almost any Adelaide switchboard with single-phase supply, because a typical main switch is rated at 63A or 80A and the charger's load is usually the largest single circuit but far from the only headroom-consuming one. Add a second 32A charger and the arithmetic changes fast: two chargers running flat out demand roughly 64A between them, which on a 63A main switch leaves effectively nothing for the rest of the house — no ducted air conditioning compressor cycling on, no electric oven, no pool pump, nothing. On an 80A main switch there's a little more room, but you're still relying on the rest of the home's loads staying genuinely low for the hours both chargers are pulling current, which is an unsafe assumption to build a permanent installation around.

This is why we don't simply install a second charger identical to the first and call it done. The site assessment for a two-EV household specifically maps out what else draws significant power overnight — reverse-cycle ducted systems left running, an electric hot water system on a timer, an induction cooktop used late — because that's the load the two chargers are competing against, not just each other.

Load Sharing: The Most Common Fix

Load sharing (sometimes called load management or dynamic load balancing) is the standard answer for most two-EV Adelaide households and avoids a costly supply upgrade in the majority of cases. A load-sharing device or a pair of networked smart chargers continuously monitors total current draw across the property and automatically limits or splits available power between the two chargers so combined demand never exceeds a safe, pre-set ceiling — for example, capping both chargers to a shared 40A total on a 63A supply, leaving roughly 23A of genuine headroom for the rest of the house. If one car finishes charging or is unplugged, the system automatically releases its share of that capacity to the remaining charger, so you're not manually managing anything night to night.

Some households instead choose a genuinely simpler option: a single dual-cable charger unit that serves two vehicles from one circuit, splitting or alternating current between the two cars rather than running two entirely separate circuits back to the switchboard. This can be a more cost-effective retrofit where running a second full circuit would mean a long, difficult cable path.

Not sure whether your switchboard has enough spare capacity for a second EV charger? A proper site assessment settles it before you buy anything.

Get a Same-Day Quote

Sequential and Scheduled Charging: The Low-Cost Option

If neither car needs to be at 100% by a fixed early hour, sequential charging is often the cheapest, simplest path and needs no additional hardware beyond standard smart-charger scheduling. One vehicle charges first at full speed; once it's finished (or reaches a set threshold), the second vehicle begins. Most household EVs fully replenish a typical daily commute's worth of range in well under the eight-hour overnight window most retailers offer discounted off-peak rates for, so queuing two vehicles back to back between roughly 10pm and 6am still comfortably has both topped up by morning in the overwhelming majority of households. This approach sidesteps the need for a load-sharing device entirely — you're simply not drawing both chargers' current at the same instant. If you're weighing up charger speed for either vehicle, our guide on home EV charger levels and charging speed breaks down what 7kW versus faster options actually delivers overnight.

When a Supply Upgrade or Three-Phase Power Genuinely Becomes Necessary

Load sharing and sequential scheduling solve the problem for most households, but there are specific situations where they stop being a practical fix and an actual supply upgrade — or a shift from single-phase to three-phase power — is the right call. The clearest signal is wanting both vehicles charging at full 7kW+ speed simultaneously every single night, for example where both drivers do long daily commutes or rideshare/delivery work and genuinely cannot tolerate a queued second charge. The other signal is a switchboard that's already near its limit before EV charging even enters the picture — an older board feeding ducted air conditioning, an electric hot water system, and a pool pump on a home built with a smaller original supply. In either case, the conversation shifts from "add a load-sharing device" to "does this property need a heavier single-phase connection, or three-phase power," which is a genuinely bigger job involving SA Power Networks approval and, in some cases, a full switchboard rebuild. Our separate guide on three-phase power upgrades covers what that process and cost range actually looks like when it's warranted.

Overnight Scheduling and Electricity Plan Strategy for Two EVs

Beyond the wiring itself, the practical reality of running two EVs from one house is largely about scheduling discipline. Most Adelaide retailers offer off-peak or EV-specific plan windows, commonly overnight, where energy costs meaningfully less than daytime rates — and running two vehicles' worth of charging entirely inside that window rather than starting one at dinner time can make a genuine difference to the household's running cost over a year. Smart chargers and load-sharing systems typically let you set both a start time and an end-by time per vehicle, so you can schedule the higher-priority commuter vehicle to finish first while the second car queues in behind it, all still landing inside the cheaper overnight window. If your retail plan has a demand or capacity charge component tied to your single highest half-hour of draw in a billing period, load sharing has a secondary benefit here too — capping combined charger draw avoids creating an unnecessary demand spike purely from EV charging overlapping with another large appliance cycling on.

Getting the Two-Charger Site Assessment Right

Whichever path suits your household, the starting point is the same: a proper on-site capacity assessment rather than a guess based on your main switch rating alone. We check your switchboard's actual spare capacity against every existing circuit, confirm whether your property is single-phase or three-phase, and — where load sharing is the right fix — spec and install a device suited to your specific charger brands, since compatibility varies across networked and standalone units. Where the honest answer is that a supply upgrade makes more sense long-term, we'll say so upfront rather than fitting a workaround that leaves you managing charging schedules manually for years.

Sources referenced include SA Power Networks' published connection and network capacity guidance at sapowernetworks.com.au, and AS/NZS 3000 wiring rules requirements for switchboard and circuit protection via standards.org.au. Keeping two chargers running well is mostly a matter of simple checks — see our guide on caring for your EV charger: simple checks.

Frequently Asked Questions

Can a standard Adelaide home switchboard handle two EV chargers?

Often not at full power simultaneously. Most Adelaide homes have a single-phase supply capped around 63A to 80A, and two 32A Level 2 chargers running flat out would demand roughly 64A on their own, leaving little headroom for the rest of the house. A load-sharing device, a lower shared current limit, or a supply upgrade is usually needed to run two chargers safely.

What is EV charger load sharing and how does it work?

Load sharing (also called load management or dynamic load balancing) is a device or networked charger feature that continuously monitors total current draw and automatically limits or splits the available power between two chargers so combined demand never exceeds a safe, pre-set maximum. It lets two EVs charge from the same switchboard without exceeding your main switch rating or tripping breakers.

Do I need three-phase power to charge two EVs at home?

Not necessarily. Many two-EV households manage comfortably on single-phase supply using load sharing or simply scheduling charging sequentially overnight. Three-phase power becomes genuinely worthwhile if you want both vehicles charging at full 7kW+ speed simultaneously every night, or if your existing switchboard is already near capacity with other large loads like ducted air conditioning or electric hot water.

Is it cheaper to charge two EVs sequentially rather than at the same time?

Sequential charging (one car first, then the other) doesn't usually change the total energy cost, but it avoids the need for a load-sharing device or supply upgrade, and it pairs well with off-peak electricity plan windows since most EVs still fully charge overnight even when queued behind each other.

Planning a Second Home EV Charger?

Get an on-site capacity assessment before you buy — it's the difference between the right solution and an expensive guess.

Disclaimer: This article is provided as general information and guidance only. It draws on publicly available sources, government and industry publications (referenced where relevant), and Voltas Electrical Adelaide's own trade experience — it is not personalised advice for your specific property and does not replace a licensed, on-site assessment. Regulations, pricing, and product or brand details can change over time, so please independently verify anything relevant to your decision and seek your own professional advice before acting. To the fullest extent permitted by law, Voltas Electrical Adelaide accepts no responsibility or liability for any loss, damage, or other outcome arising from reliance on the information in this article. Where this article refers to a same-day or obligation-free quote or assessment, that refers to the quote or assessment itself — a site visit to a property well outside our normal Adelaide metro service area may incur a travel or call-out fee, as set out in our Terms & Conditions, which also has full details on the points above.

Get a Quote Call Now: 1800 865 827