It's a genuinely common scenario across Adelaide: a home starts with a single split system in the main living area, and over a few years, one gets added to the main bedroom, then another to a second bedroom, then a small home office. Each installation on its own seems straightforward. What often doesn't get asked, until a switchboard is already crowded with circuit breakers, is whether the property's electrical supply can actually support all of them running at once — and whether they should even share circuits in the first place.
Voltas Electrical & Airconditioning has been installing split systems and the electrical circuits behind them across Adelaide since 2010, holding electrical licence BLD 274739, plumbing/gasfitting licence PGE 265145, and ARCtick refrigerant licence AU 61210. Assessing existing switchboard capacity before adding "just one more" split system is one of the most common things our electricians get asked to check, precisely because the answer genuinely varies from one Adelaide property to the next.
Why each split system should have its own dedicated circuit
A split system's compressor draws a noticeably higher current at start-up than during normal running — a brief surge as the motor overcomes internal pressure and gets moving. Manufacturer installation instructions for major brands, including Daikin, Mitsubishi Electric, Fujitsu General, and Panasonic, typically specify a dedicated circuit sized to that particular model's electrical load, and AS/NZS 3000 (the Australian/New Zealand Wiring Rules) requires that circuit to have its own correctly rated overcurrent protection matched to the cable and the appliance. Two compressors sharing a single circuit means their start-up surges can occur close together or simultaneously, which risks nuisance tripping of that circuit's breaker at exactly the moment both units are trying to cool the house hardest — typically the peak of an Adelaide heatwave.
This is a genuinely different question to the one covered in our guide on multi-split versus single-split systems, which compares one outdoor unit feeding several indoor heads against several fully separate systems. Here, we're talking about multiple entirely separate split systems, each with its own outdoor unit, and whether they can share electrical infrastructure — the answer, in short, is that each one is treated as its own dedicated electrical circuit regardless of how the split systems themselves are configured. Our guide to dedicated circuits explained covers the general principle behind why certain high-draw appliances get their own circuit; a split system's compressor is a textbook example of exactly that category of load.
Adding split systems room by room? Get your switchboard's remaining capacity checked before the next one goes in.
Get a Same-Day QuoteHow an electrician actually calculates switchboard capacity
There's no fixed "you can fit X split systems on a switchboard" number that applies universally, because it depends on several variables specific to that property:
- The switchboard's total rated capacity — how much current the board itself, and the incoming supply from the street, is rated to carry safely, which varies between older single-phase residential supplies and larger or three-phase supplies.
- How much capacity existing circuits already use. Hot water systems, ducted heating, ovens, and general lighting and power circuits all draw from the same total supply. An electrician tallies the existing load — including realistic diversity, since not everything runs flat-out simultaneously — before working out what headroom remains.
- The specific electrical load of each split system being added, based on that model's rated running current and start-up characteristics, not a generic assumption.
- Whether the supply itself needs upgrading, separate to the switchboard — in some cases the switchboard has spare physical slots for more circuit breakers, but the incoming supply capacity from the street is the actual limiting factor, which is a different fix again.
This is why two seemingly similar Adelaide homes can get different advice: one with a modern switchboard and generous supply might comfortably support four split systems with room to spare, while an older home with an ageing board already carrying an electric hot water system and a ducted heater might struggle to safely add a second split system without upgrading first. For larger installations, particularly small offices or homes considering several higher-capacity units, our guide to three-phase power upgrades covers when moving beyond a standard single-phase supply becomes the more sensible path, since three-phase supply spreads heavier combined loads more evenly and typically has more headroom for multiple compressor-driven appliances.
When a switchboard upgrade becomes necessary
The clearest sign a switchboard upgrade is overdue is a load calculation that shows the existing board and supply genuinely can't support the next split system safely — not a guess, but an actual calculation an electrician documents. Physical signs worth flagging to your electrician include a switchboard that's already full of circuit breakers with no room for another, an older board using outdated fuses rather than circuit breakers and safety switches, or a history of nuisance tripping when multiple appliances run together. Any new circuit, switchboard alteration, or upgrade in South Australia needs to be carried out by a licensed electrician and documented with a Certificate of Compliance (eCoC) lodged with the SA Office of the Technical Regulator — this isn't optional paperwork, it's the legal record that the work meets AS/NZS 3000. Our electrical upgrades team handles this assessment and the upgrade work itself, while our electrical installation technicians wire in each new dedicated circuit as additional split systems are added. We see this pattern regularly in growing family homes across Fairview Park and Greenwith, where a switchboard sized for the original build is progressively asked to support two, three, or four split systems added over successive summers.
Frequently Asked Questions
Can two split systems share the same electrical circuit?
Generally no. Manufacturer installation instructions typically call for a dedicated circuit per split system, and AS/NZS 3000 requires that dedicated circuit to be sized correctly for that unit's specific load with its own overcurrent protection. Sharing a circuit between two compressors risks nuisance tripping under simultaneous start-up loads and isn't how these systems are designed to be installed.
How many split systems can a switchboard support?
There's no fixed number that applies to every property — it depends on the switchboard's total rated capacity, the incoming supply capacity from the street, and how much of that capacity is already used by existing circuits like hot water, cooking, lighting and general power. A licensed electrician calculates this with a proper load assessment rather than a rule of thumb, since two similar-looking Adelaide homes can have very different remaining capacity.
When do I need a switchboard upgrade for multiple split systems?
A switchboard upgrade becomes necessary when a load calculation shows the existing board and incoming supply can't safely support the additional circuits needed for more split systems, which is common in older Adelaide homes progressively adding a unit to each bedroom over several years. Signs it may already be needed include a switchboard that's physically full of circuit breakers with no room for another, or one already close to its rated capacity.
Planning another split system?
Our licensed electricians assess your switchboard's remaining capacity before you commit to the next installation, with same-day appointments the norm across Adelaide.
Sources referenced include AS/NZS 3000 (the Australian/New Zealand Wiring Rules), South Australia's Office of the Technical Regulator (energymining.sa.gov.au) on electrical certification, and manufacturer installation documentation on dedicated circuit requirements.
Disclaimer: This article is provided as general information and guidance only. It draws on publicly available sources, government and industry publications (referenced where relevant), and Voltas Electrical Adelaide's own trade experience — it is not personalised advice for your specific property and does not replace a licensed, on-site assessment. Regulations, pricing, and product or brand details can change over time, so please independently verify anything relevant to your decision and seek your own professional advice before acting. To the fullest extent permitted by law, Voltas Electrical Adelaide accepts no responsibility or liability for any loss, damage, or other outcome arising from reliance on the information in this article. Where this article refers to a same-day or obligation-free quote or assessment, that refers to the quote or assessment itself — a site visit to a property well outside our normal Adelaide metro service area may incur a travel or call-out fee, as set out in our Terms & Conditions, which also has full details on the points above.